Footfall is not the metric
A stand can be busy and useless. Visitors who take a giveaway and leave cost you the giveaway and the floor space.
The metric worth tracking is qualified enquiries - people who described a requirement you can actually service - and the ratio of those to total conversations.
That ratio is influenced mostly by what your stand says before anyone speaks.
The three-second test
A visitor walking an aisle decides whether to slow down in about three seconds, from six metres away, reading only what is large enough to read.
So the top band of your stand should say what you make - specifically, in plain words - rather than your company name or a slogan. Somebody who cannot tell what you do will not stop to find out.
This is the single most common and most fixable exhibition mistake, and it costs more than any amount of stand fabrication.
What earns a conversation
Something to look at that is genuinely yours: a product, a cutaway, a process graphic, real application photography. For industrial exhibitors whose product is too large to bring, this is what the graphics have to do.
Space to stand. A stand packed with furniture has nowhere for a conversation to happen.
Staff who are not sitting down, eating, or on a phone. No amount of design survives that.
And a clear next step: a datasheet, a sample, a scheduled call.
What leaves with the visitor
Collateral does more work than the stand does, because it is read later, by more people, in a quieter place.
The useful structure is a slim overview for everyone plus detailed sheets or a catalogue for real prospects. That way the expensive piece goes to people who will read it.
Running out on day one is the most common collateral failure; carrying eighty per cent home is the second. Both are quantity-planning problems.
A giveaway that is useful and branded restrainedly outlasts the show. One that is obviously bulk-bought with a logo added is thrown away in the car park.
Where the budget is wasted
Elaborate fabrication that nobody notices, on a stand whose top band does not say what you make.
Disposable stands rebuilt for every show. At three or more shows a year, a reusable system with re-skinned graphics costs less over the year.
Late artwork, which turns into rush charges across print, fabrication and freight simultaneously.
And no follow-up plan. Enquiries collected at a show and actioned three weeks later have mostly gone cold, which makes the whole exercise an expensive way to collect visiting cards.
Practical scheduling
Artwork settled three weeks before build day is comfortable; two is normal; one is tight and depends on press availability.
Send the stall layout with dimensions and the build slot at the start - panel sizes, fixings, packing and transport all follow from them.
Everything leaves here labelled by position with fixings attached to their pieces, because the crew building it did not design it.

